Jump to content
  • Welcome to SEFP!

    Welcome!

    Welcome to our community forums, full of great discussions about Structural Engineering. Please register to become a part of our thriving group or login if you are already registered.

Shout Box

Sign in to follow this  

Any thing not related to engineering profession goes here. Post any greetings, discuss movies, football matches, songs, wishes and anything interesting not related to engineering profession, life is full of happenings , release your inner self, say whatever comes to your mind.

68 topics in this forum

    • 13 replies
    • 4,905 views
  1. Tallest Building In Pakistan

    • 12 replies
    • 1,734 views
    • 2 replies
    • 1,369 views
  2. Quote

    • 22 replies
    • 1,346 views
    • 7 replies
    • 961 views
    • 3 replies
    • 861 views
    • 1 reply
    • 787 views
    • 7 replies
    • 785 views
  3. Must Watch Movies

    • 6 replies
    • 784 views
    • 0 replies
    • 778 views
    • 1 reply
    • 755 views
    • 1 reply
    • 703 views
    • 0 replies
    • 695 views
    • 0 replies
    • 693 views
  4. Ramadan Mubarak

    • 3 replies
    • 688 views
  5. Ramadan Mubarak

    • 1 reply
    • 669 views
  6. Need Job

    • 0 replies
    • 640 views
  7. Eid Mubarik Members

    • 8 replies
    • 619 views
    • 1 reply
    • 615 views
    • 3 replies
    • 585 views
    • 1 reply
    • 575 views
    • 0 replies
    • 540 views
    • 0 replies
    • 538 views
  8. Suggestions To Admin

    • 3 replies
    • 535 views
    • 4 replies
    • 520 views
Sign in to follow this  
  • Our picks

    • Assalam o alaikum.
      According to ACI 12.5.2,
      development length for fc' = 3000, fy=60000, for normal weight concrete and epoxy less reinforcement, The required development length comes out to be
      for #3 = 8.2 inch
      for #4 = 10.95 inch
      for #6 = 16.42 inch
      for #8 = 21.9 inch
       
      And if in my case, ACI 12.5.3 is not fulfilled, it means now i have to provide ldh as mentioned above. ldh is STRAIGHT EMBEDMENT LENGTH + RADIUS OF BEND + ONE BAR DIAMETER as shown in figure attached. Now my question is, if in my case, main reinforcement of beam is of #6 and #4, minimum column size required will be 18 inch and 12 inch respectively. Lets say by any means, i can not select #4, #3 bars and size of column where bars are to be terminated is 12 inch, how to fullfil this development length???
      • 11 replies
    • Dear all,

      I am trying to design shearwalls through ETABS with temperature load applied over shell. At various location, spandral section fails in Shear due to temperature and piers (sometime in shear, mostly in flexure).  (See Attached Image)

      Certainly all the problem in Shearwalls are due to temperature. I don't want to increase cross section of spandral or pier at some location just due to temperature load case as it will appears non-uniform with rest of the wall. 

      I have seen stiffness modifier affect distribution of forces and also rigid/semi rigid daiphragm assumption. 

       

      Can anybody guide how to properly design the shear wall with temperature load applied in ETABS or share any similar experience. Thanks in Advance.    
      • 15 replies
    • ENGINEERS;
      I WILL LOOSE MY BRAIN FROM ETABS. 
      I DECIDED TO MAKE MANUAL MESHING FROM AREA ELEMENTS BESIDE EACH OTHER AND EVERY HING WAS FINE .
      BUT AFTER DEVISION SAY 7*7 ELEMNTS FOR EVERY BIG ELEMENT AND MAKING ETABS CHECH..................THEN 500 ERROR MESSAGE THAT ALL ELEMNTS ARE CLOSE TO EACH OTHER.  WHAT ARE GOING...... SOMEONE TELL ME PLEASE...... I WILL LOST MY WORK
      • 6 replies
    • Assalam o alaikum.
      I have just designed a frame structure with SMRF. The out put of shear seams weird to me. Column reports design shear Av/s as 0.045. (Images are attached). but when i right click the member, it must show me the most critical case HIGHLIGHTED AUTOMATICALLY. But it highlights load combo 38 (auto-generated combos have been used) which reports Av/s as 0.038. And 0.045 value is at combo 32. Is their any logic behind it?? More over how to interpret this Av/s?? means 0.045 in kip-in units means what? How can i convert this into spacing?? 
      • 9 replies
    • Hello everyone, I hope all of you will be fine. In etabs when we apply Response Spectrum loading on a multistoried building with 2 basement floors. At what floor level this loading will be applied as in equivalent static seismic analysis, we can apply EQX & EQY on any floor we like as this option is available in etabs but the problem is with response spectrum and time history analysis. please if someone knows and have the experince, share it i shall be very thankful.  
      • 5 replies
  • Recently Browsing   0 members

    No registered users viewing this page.

×

Important Information

By using this site, you agree to our Terms of Use and Guidelines.