Jump to content
  • Welcome to SEFP!

    Welcome!

    Welcome to our community forums, full of great discussions about Structural Engineering. Please register to become a part of our thriving group or login if you are already registered.

General Discussion

Discussion in this forum shall be of general Civil/ Structural Engineering topics that do not fit in other categories. Non Engineering topics shall be posted in Shout Box.

144 topics in this forum

    • 6 replies
    • 1,315 views
    • 1 reply
    • 362 views
    • 9 replies
    • 556 views
  1. Rusting On Steel Reinforcemnt

    • 2 replies
    • 608 views
    • 2 replies
    • 313 views
    • 1 reply
    • 582 views
    • 6 replies
    • 647 views
    • 7 replies
    • 658 views
    • 0 replies
    • 634 views
  2. Etabs 2013 Tutorial

    • 1 reply
    • 1,272 views
  3. Length Of Steel In Piles

    • 0 replies
    • 326 views
    • 2 replies
    • 560 views
    • 2 replies
    • 543 views
  4. Meshing Issue

    • 3 replies
    • 504 views
  5. Water Tank

    • 1 reply
    • 491 views
  6. Graphic Calculator

    • 3 replies
    • 413 views
    • 4 replies
    • 782 views
    • 3 replies
    • 410 views
    • 5 replies
    • 1,078 views
    • 4 replies
    • 501 views
    • 7 replies
    • 667 views
    • 5 replies
    • 678 views
    • 2 replies
    • 881 views
  7. Codes

    • 1 reply
    • 526 views
  8. Column Failure!!!

    • 3 replies
    • 776 views
  • Our picks

    • AOA 

      i am facing problems in shear wall design .what are the pier and spandral ?what will be the difference when we assign pier or spandral? without assigning these the shear wall design is incomplete .

      i am taking about etabsv16

      someone have document about shear wall design plz provide it 

      thank you

       
      • 9 replies
    • Salam Members,

      Congratulations to Engineers, PEC has become full signatory of Washington Accord, what are the benefits to Pakistani engineers for this agreement. 

       

      Regards   

       

       
      • 3 replies
    • Please clarify the following confusions one by one:-

       

      1. If we run P-delta analysis in ETABS, then should we ignore stiffness property modifiers for beams and columns? I have heard that if we perform P-delta analysis and apply stiffness modifiers at the same time then the moment magnification process is doubled...?

       

      2. ETABS considers selenderness of a column by applying moment magnification factors. If we run P-delta analysis also, does it mean that the selenderness of column is being over-estimated? I mean once the moments are magnified in P-delta analysis process and again through moment magnification process?

       

      Please help me understand the software myth and clarify above confusions.
      • 1 reply
    • Assalam o alaikum.
      According to ACI 12.5.2,
      development length for fc' = 3000, fy=60000, for normal weight concrete and epoxy less reinforcement, The required development length comes out to be
      for #3 = 8.2 inch
      for #4 = 10.95 inch
      for #6 = 16.42 inch
      for #8 = 21.9 inch
       
      And if in my case, ACI 12.5.3 is not fulfilled, it means now i have to provide ldh as mentioned above. ldh is STRAIGHT EMBEDMENT LENGTH + RADIUS OF BEND + ONE BAR DIAMETER as shown in figure attached. Now my question is, if in my case, main reinforcement of beam is of #6 and #4, minimum column size required will be 18 inch and 12 inch respectively. Lets say by any means, i can not select #4, #3 bars and size of column where bars are to be terminated is 12 inch, how to fullfil this development length???
      • 11 replies
    • Dear all,

      I am trying to design shearwalls through ETABS with temperature load applied over shell. At various location, spandral section fails in Shear due to temperature and piers (sometime in shear, mostly in flexure).  (See Attached Image)

      Certainly all the problem in Shearwalls are due to temperature. I don't want to increase cross section of spandral or pier at some location just due to temperature load case as it will appears non-uniform with rest of the wall. 

      I have seen stiffness modifier affect distribution of forces and also rigid/semi rigid daiphragm assumption. 

       

      Can anybody guide how to properly design the shear wall with temperature load applied in ETABS or share any similar experience. Thanks in Advance.    
      • 15 replies