Jump to content

Search the Community

Showing results for tags 'tie beam'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • Member Introduction
    • Shout Box
    • Students Zone
    • Engineering Marvels & Disasters
  • Civil/ Structural Engineering
    • General Discussion
    • Steel Design
    • Concrete Design
    • Seismic Design
    • Foundation Design
    • Software Issues
    • Journal/ Articles/ Tutorials
    • Spreadsheets & Softwares
  • Technical Support
    • Website Announcements/ Problems/ Login/ Registration Issues
  • PSX Stocks Investing's Topics
  • Parenting's Topics
  • Construction Consulting's Industrial Construction Project
  • Construction Consulting's Piling

Calendars

  • Community Calendar
  • Construction Consulting's Piling

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Skype


Location


University


Employer


Interests

Found 4 results

  1. Respected all, I am working on project which has foundation consist of Pile Caps, Tie beam and tie slab. The problem which I felt is that when I see reinforcement of tie beam it shows me too much reinforcement like 30-#8 in top and around 20-#8 with beam size 18"X72"(Depth as per Pile Cap Thickness), all the reinforcement is showing in SAFE. But when I resized the tie beam size to 12"X24" it shows very lesser reinforcement. Now the question arises in my mind is that what to do with size of tie beam? Can I reduce the size of tie beam if yes then can some one provide code backing or authentic background? or if not possible then I can placed the same reinforcement as provided by SAFE.
  2. assalamualaikum sepakistan, i wanna ask how do you design properly the tie beam? i always use the moment from base column (fixed base support) to design the properties (geometri and steel reinforcement) and its the same value of steel along the beam (from the support to middle and to support again). theres also a 10% of gravity of column additionaly as a axial load on the beam. so i use an interaction diagram just like design the column. because the moment of base already got taken by the tie beam then i never consider moment anymore when design the footing. Am i doing it right? please correct me if im wrong and additional question is whats the difference between the tie beam, ground beam, grade beam and plinth beam? thank you regards
  3. Dear engineers; 1. For what we need tie beams ? 2. I mean if I take the first floor's columns' height into consideration in my model ? 3. Will it carry the slab on grade ? 4. In case of Raft then no need for thetie beams since the slab on grade will lay on the raft Yes? Regards
  4. Assalam o alaikum seniors, I am searching for some design example of TIE BEAM DESIGN.... I am having sap reactions of all the columns.. I need detail of manual design of tie beam. Or info how to design it. I also want to design it for differential settlement of columns and for lateral loads also... How shud i take these loads in my design??? If i design this beam in sap2000, i apply gravity load and support settelemnt of 25 mm at one end of beam and design it, will it be OK? Shud i take soil reaction from bottom or shud i neglect it? Jazak Allah...
×
×