Jump to content

Search the Community

Showing results for tags 'concrete design'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • Member Introduction
    • Shout Box
    • Students Zone
    • Engineering Marvels & Disasters
  • Civil/ Structural Engineering
    • General Discussion
    • Steel Design
    • Concrete Design
    • Seismic Design
    • Foundation Design
    • Software Issues
    • Journal/ Articles/ Tutorials
    • Spreadsheets & Softwares
  • Technical Support
    • Website Announcements/ Problems/ Login/ Registration Issues
  • PSX Stocks Investing's Topics
  • Parenting's Topics
  • Construction Consulting's Industrial Construction Project
  • Construction Consulting's Piling

Calendars

  • Community Calendar
  • Construction Consulting's Piling

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Skype


Location


University


Employer


Interests

Found 7 results

  1. AOA everyone. Recently I've been very confused with development length and how its provided in different components. I have a few conceptual confusions about it and then a few practical and design aspects of it. I'd really appreciate help on these. Do we provide/check development length for simply supported beams (i.e. check it past the max moment?) Where do we need to check for development length? (in my understanding, we need to check it almost everywhere, where you need to ensure full moment capacity) What is a "critical section" when we talk about development length? (refer to the attached picture) I think its the point beyond which we need to ensure development At a wall-slab joint where both the slab and wall are 8" thick, if #6 bars at 8" c/c need to be developed from the slab into the wall, I found that even with the 90 degree hook, the development length is at least 14". How do you satisfy development length in such a case? For hooked development length ldh, is it the length up to the hook or is the length that includes the length of the hook? For example for a 90 degree hook, would it be 12db+the length beyond the critical section or just the length beyond the critical section up to the hook? I've seen in a few places on the internet that people include the 12db into the development length. This stuff has been eating up gray matter from my brain for a few days now. Any help is appreciated. Thanks!
  2. Dear Members, I am designing 13 storey commercial building. Plot is trapezoidal having larger length in Y direction and shorter in X direction. Due to the shape of plot and building as well i have to introduce shear walls in X direction to control torsion and drift. But client is not happy with the dimensions of shear walls and colum. Can anyone suggest a structural system for designing in which i can economize the cross-sections and control the drifts as well?
  3. dear all, i have some questions and i am hoping to find some answers from you kind people. 1) when we use doubly reinforced beams how can be obtain economy be controlling ceiling height ? 2) where do we use bar curtailment and bent up bars in beams because there are not ACI provisions related to bar curtailment (as far as i know) 3)i have seen examples in books they calculate steel area for beams and they provide combination of different dia bars to satisfy that area why they do it because they can satisfy same area using same dia bars ? 4)which design method Etabs uses. LRFD or ASD? 5) how do we design the hanger bars. what is ACI provision for it? 6)where do we use inclined stirrups in beams ? 7) how the longitudinal reinforcing can be used as shear reinforcement ? Thank you all in advance. Looking forward to your responses.
  4. I am just starting with the structural design using ETABS. So that makes me curious if something unusual happens. I have attached a screenshot of my analysis of a beam. It shows that I am having positive moments at support from one side of a support, whereas negative at the other side(which is usual) for the governing design combo. I am just unable to perceive positive moments at support. Just posting it so that members can help me if this is usual or have I done something wrong while modeling. Looking forward for responses.
  5. Assalam-o-alaikum! You can get soft copies (PDF files) of the following two publications, FREE OF COST from PCA website: 1. PCA Notes on ACI 318-11 (Link: http://members.cement.org/EBiz55/ProductCatalog/Product.aspx?ID=2137) 2. 'Simplified Design of Reinforced Concrete Buildings', based on ACI 318-11 and IBC 2009 by Kamara & Novak 2013 (Link: http://members.cement.org/EBiz55/ProductCatalog/Product.aspx?ID=2246) You will need to go through following steps: a. login at PCA website, after creating a free membership account using your valid email address. b. Search and add the above publications to your 'cart'. c. Both pdf files are password protected. The passwords will however be displayed in your purchase list, after you add these downloadable items to the 'cart'. Note the passwords, before 'Check out' & confirming your order. d. 'Update' and 'Complete/Confirm' the order. A confirmation email, with a web link, will be sent to your email address. e. Go to your email. Click on or open the link in separate window. f. Login, and download the files from 'Available Downloads' list. Enjoy! Regards.
  6. how to select a specified concrete compressive strength( f'c) for a designing bulding or ...?
  7. Which design code should we use for the design of reinforced concrete structures in Pakistan? Which authority, law or rule directs to use this code?
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.