Jump to content

Search the Community

Showing results for tags 'tunnel'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • Member Introduction
    • Shout Box
    • Students Zone
    • Engineering Marvels & Disasters
  • Civil/ Structural Engineering
    • General Discussion
    • Steel Design
    • Concrete Design
    • Seismic Design
    • Foundation Design
    • Software Issues
    • Journal/ Articles/ Tutorials
    • Spreadsheets & Softwares
  • Technical Support
    • Website Announcements/ Problems/ Login/ Registration Issues
  • PSX Stocks Investing's Topics
  • Parenting's Topics

Calendars

  • Community Calendar

Found 4 results

  1. TUNNEL DESIGN ON SAP2000

    Kindly share any material on how to design a tunnel on sap2000. Attached is a pic of a model i found somewhere. this person has braced the tunnel by using "link supports" which I have no idea about since i have ever used them. Whats the purpose of these supports? Its properties have terms like coupled or uncoupled stiffness. and factors for line area and solid springs etc. That image is attached too and the values this person has entered are 1000 and 1000000. Its going above my head. Please guide about this and also how to calculate stiffness and when to define stiffness for a member?
  2. TUNNEL DESIGN

    I AM TIRED OF SEARCHING WEB FOR TUNNEL DESIGN MATERIAL. GOT ONE EXCEL SHEET WITH SHORT CALCULATION AND NO IDEA HOW THEY DID IT. PLEASE REFER ME TO ANY TUNNEL DESIGN SOFTWARE OR MANUAL EXAMPLES SO THAT I MAY BE ABLE TO UNDERSTAND TUNNEL DESIGN IN DEPTH.
  3. TUNNEL DESIGN

    CANT FIND SOLVED EXAMPLES FOR CONCRETE OR STEEL TUNNEL DESIGN. SHARE IF YOU HAVE ANY. OR ANY SAP2000 MODEL OR TUTORIAL SHOWING HOW TO APPLY DIFFERENT TUNNEL LOADS. JAZAKALLAH.
  4. Assalam-o-alaikum, Dear Colleagues! The Øresund bridge is an engineering marvel that connects the Danish capital of Copenhagen to the Swedish city of Malmö. A cable-stayed bridge runs nearly 8 km (5 miles) to an artificial island where it transitions into a tunnel that runs another 4 km (2.5 miles). The award-winning double-track railway and motorway opened on July 1, 2000. For more details refer to the following link: http://twistedsifter.com/2015/09/oresund-bridge-turns-into-tunnel-and-connects-denmark-and-sweden/
×

Important Information

By using this site, you agree to our Terms of Use and Guidelines.