BAZ

Incorrect floor framing

Recommended Posts

The beam with larger depth should be the main beam, and the beam smaller depth should be the secondary beam. By main beam, I mean that the beam has ability to attract forces from adjoining members because of its larger stiffness.

Keeping that thing in mind, secondary beams should have been transferring the reaction directly to main beams, and main beams should have been transferring the loads of secondary beams, which are carrying the load of metal deck and the live load, to concrete beams.

In the figure, they have placed larger and smaller size beams in the same directions. If smaller size are able to carry load, as is evident from the standing structure, why use larger beams. They have wasted material.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

Sign in to follow this  

  • Our picks

    • AoA all,

      Is it mandatory to do column concreting upto the soffit of the beam in a single pour ?

      What code says about the construction/cold joint location in column ?

      Majority of the contractors are pouring the column concrete upto the soffit of the beam (full height of the column), some contractors leave the column height about 9" to 12" below the beam level and then fill this 9" to 12" column height with the beams & slab concreting. On one site column concreting was stopped at the mid height and the remaining half was filled on the next day.

      Thanks

       

       
      • 4 replies
    • AOA 

      i am facing problems in shear wall design .what are the pier and spandral ?what will be the difference when we assign pier or spandral? without assigning these the shear wall design is incomplete .

      i am taking about etabsv16

      someone have document about shear wall design plz provide it 

      thank you

       
      • 9 replies
    • Salam Members,

      Congratulations to Engineers, PEC has become full signatory of Washington Accord, what are the benefits to Pakistani engineers for this agreement. 

       

      Regards   

       

       
      • 3 replies
    • Please clarify the following confusions one by one:-

       

      1. If we run P-delta analysis in ETABS, then should we ignore stiffness property modifiers for beams and columns? I have heard that if we perform P-delta analysis and apply stiffness modifiers at the same time then the moment magnification process is doubled...?

       

      2. ETABS considers selenderness of a column by applying moment magnification factors. If we run P-delta analysis also, does it mean that the selenderness of column is being over-estimated? I mean once the moments are magnified in P-delta analysis process and again through moment magnification process?

       

      Please help me understand the software myth and clarify above confusions.
      • 1 reply
    • Assalam o alaikum.
      According to ACI 12.5.2,
      development length for fc' = 3000, fy=60000, for normal weight concrete and epoxy less reinforcement, The required development length comes out to be
      for #3 = 8.2 inch
      for #4 = 10.95 inch
      for #6 = 16.42 inch
      for #8 = 21.9 inch
       
      And if in my case, ACI 12.5.3 is not fulfilled, it means now i have to provide ldh as mentioned above. ldh is STRAIGHT EMBEDMENT LENGTH + RADIUS OF BEND + ONE BAR DIAMETER as shown in figure attached. Now my question is, if in my case, main reinforcement of beam is of #6 and #4, minimum column size required will be 18 inch and 12 inch respectively. Lets say by any means, i can not select #4, #3 bars and size of column where bars are to be terminated is 12 inch, how to fullfil this development length???
      • 11 replies
    • Dear all,

      I am trying to design shearwalls through ETABS with temperature load applied over shell. At various location, spandral section fails in Shear due to temperature and piers (sometime in shear, mostly in flexure).  (See Attached Image)

      Certainly all the problem in Shearwalls are due to temperature. I don't want to increase cross section of spandral or pier at some location just due to temperature load case as it will appears non-uniform with rest of the wall. 

      I have seen stiffness modifier affect distribution of forces and also rigid/semi rigid daiphragm assumption. 

       

      Can anybody guide how to properly design the shear wall with temperature load applied in ETABS or share any similar experience. Thanks in Advance.    
      • 15 replies
    • ENGINEERS;
      I WILL LOOSE MY BRAIN FROM ETABS. 
      I DECIDED TO MAKE MANUAL MESHING FROM AREA ELEMENTS BESIDE EACH OTHER AND EVERY HING WAS FINE .
      BUT AFTER DEVISION SAY 7*7 ELEMNTS FOR EVERY BIG ELEMENT AND MAKING ETABS CHECH..................THEN 500 ERROR MESSAGE THAT ALL ELEMNTS ARE CLOSE TO EACH OTHER.  WHAT ARE GOING...... SOMEONE TELL ME PLEASE...... I WILL LOST MY WORK
      • 6 replies
    • Assalam o alaikum.
      I have just designed a frame structure with SMRF. The out put of shear seams weird to me. Column reports design shear Av/s as 0.045. (Images are attached). but when i right click the member, it must show me the most critical case HIGHLIGHTED AUTOMATICALLY. But it highlights load combo 38 (auto-generated combos have been used) which reports Av/s as 0.038. And 0.045 value is at combo 32. Is their any logic behind it?? More over how to interpret this Av/s?? means 0.045 in kip-in units means what? How can i convert this into spacing?? 
      • 9 replies
    • Hello everyone, I hope all of you will be fine. In etabs when we apply Response Spectrum loading on a multistoried building with 2 basement floors. At what floor level this loading will be applied as in equivalent static seismic analysis, we can apply EQX & EQY on any floor we like as this option is available in etabs but the problem is with response spectrum and time history analysis. please if someone knows and have the experince, share it i shall be very thankful.  
      • 5 replies
    • Salaikom dear professionals,
      First of all I would like to express my sincere thanks to the initiators of this forum for establishing such an exceptional atmosphere for knowledge/experience sharing, I it is really useful, In fact since I have found the forum I am mostly online and busy reading the posts. I would also like to thank the members for their professional comments and advice.
      As my first post in this forum I would like to ask the following queries:
      1-After running the analysis and design when I check the DESIGN DATA through Display >> Show Tables >> DESIGN DATA >> Concrete Frame Output, there is no specific message in Column Summary Data and Beam Summary Data, but in Joint summary data it is showing that “Joint B/C check not done”. Does anyone has any idea? I am sharing the ETABS model for your information and easy reference.
      ETABS MODEL.zip
      2- ETABS provides greater area of steel in the upper column than the column at BASE, perhaps due to higher moment. Could someone explain why this is so? In practice should we maintain maximum steel in both stories? Or we shall follow what the software suggests?
      3- Beside considering the minimum thickness required for deflection control of Beam as per Table 9.a Chapter 9 ACI-318 , using concrete crack behavior in ETABS and checking story drift, Do we have to check the deflection of beams for the serviceability propose elsewhere in ETBAS? If yes, Could anyone explain it?
      Regards, and look forward to any explanation
      • 13 replies
  • Recently Browsing   0 members

    No registered users viewing this page.

  • Similar Content

    • By The Architect
      Can the slab bottom reinforcement pass below inverted beam bottom reinforcement?
      Otherwise the slab bottom reinforcement mesh will be lifted up atleast 2.5", thus reducing the design effective depth.

    • By Rizwan Khurram
      Dear All,
       Can any one tell me how to model surge  girder of 18 m span in sap or any other relevant software. 
    • By Ali Shan
      Can some body please give reference regarding torsional design of post-tensioned bridge girders? I have searched through AASHTO LRFD Bridge Design Specs but could not find a valid reference.
    • By saadyounas
      Hi guys
      In the question i have a super T girder with some reinforcement. Ques is I have to calculate compression strength in concrete block using formula C = gamma * 0.85 f'c * b (width)
      what value of b should i use to calculate this compressive force?
      thanks
      Saad

    • By kHURRAM ALI
      ASLAMWALEKUM
       
      IN ETAB MODEL THE SECONDARY BEAM BREAK ON PRIMARY BEAM ,SO THAT POINT LOAD OF SECONDARY BEAM CAN APPLY ON PRIMARY BEAM , BUT IF TWO BEAMS OF SAME STIFFNESS , SPAN AND LOADING ARE INTERSECTING AT THEIR MID POINTS , HOW TO DECIDE WHICH ONE WILL BE PRIMARY AND SECONDARY BEAM , I AM ATTACHING THE ETABS PALN

    • By saleem khan
      i want to model beam whose ends are resting on masonry wall in etabs,if i assign hinge or roller support to end points of beams how the load,moments and shear will transfer to below elements if it is a mulistorey building
    • By Jigger
      Here are a number of questions that I need answered. Help would be appreciated.
      Q1. In ETABS, what if the beam combined fail in Shear and Torsion? Need Solution
      Q2. In ETABS, Obtained moments on both ends on simple supported beams. What to do?
      Q3. Discuss dependance of foundation on bearing capacity of soil in SAFE model? What options do you have if the Bearing Capacity is very low?
      How would you check and find one way and two way shear in SAFE model?
      Q4. Why mass and weight are considered separate in ETABS?
      Q5. Differentiate b/w P-Delta analysis vs Dynamic Analysis?
      Q6. Material properties and strength of Concrete depend on what parameters?
      Q7. What limit "1" in punching shows in SAFE?
      Even if you know just one answer, please reply. It would be very helpful.
      Thank you and Regards.
  • Recent Discussions

  • Latest Forum and Club Posts

    • There are two three columns in a grid ,two are placed in the same line another is to the downward side of the two columns,The two collinear columns are at 5 m apart and the next column is at 1.5 m apart tentatively.What the engineer has done is,tie the two collinear columns with strap beam,because the edge is on the property line and moreover at a large distance apart and the interior column is combined with the downward column (the downward column is at property line too).Is it possible to use combined footing and strap footing at the same time?My concern is ,the engineer has not separated out two designs for the combined behavior of the footing ,he has designed it as separate,one is  strap footing ,the other is combined. Is it because ,the pressure intensity  disperses over large area ,so he has taken it as single behavior?Wont there be site difficulty during casting?And is the design ok??I have attached the file herewith.
    • See this topic:    It depends. I have seen some embassies get blast wall designed considering the terror threat they face. Search the forum.
    • Actually my team is insisting to work on this topic but my interest is in hydraulics...is there future of hydraulics in next 5 yes?
    • why not? any good reason why it can't be used?
    • Is it possible to use AISC360 in  building design in Pakistan? and AISC360 accredited in Pakistan?
    • Blast "proof", nothing is proof, i guess. Second, doing blast analysis in bachelors is in my opinion too much work/understanding. Question: What you want to pursue in future (atleast next 5 yrs)? hard core structural engineering design? if yes, then do something related to a bigger scope giving you an overall understanding instead of a specialized topic. if no, you could do anything then. Just my opinion.
    • Thanks for sharing, will study more about this.   The usual practice is to assume hinge for isolated foundations unless they are massive, and fixed for raft in analysis.
    • AOA I want to work on Blast proof concrete as my final year project.. Is this suitable for final year project?? plz guide me n give me new ideas regarding final year project  
    • I am also facing the same thing..plz guide me for final year project related to structures and hydraulics  
    • There is also another point in this discussion. The assumption of a fixed based for isolated foundations is not valid because these foundations are susceptible to rotation. That would mean no moment (there would be some as foundation has rotational stiffness) at column foundation interface and more moment at beam column interface  - plastic hinging in beams column joint.  Although the original discussion is about developing plastic hinge at foundation column interface but I think the fact that isolated foundations rotate makes these two conditions  mutually exclusive (some degree). If the foundation rotates then it is a pinned end and the only forces there would be shear and axial.  
×

Important Information