Jump to content
  • Welcome to SEFP!

    Welcome!

    Welcome to our community forums, full of great discussions about Structural Engineering. Please register to become a part of our thriving group or login if you are already registered.

Minimum Investment and Return


Waqar Saleem
 Share

Recommended Posts

  • Moderator

Salam

i would like to ask how much minimum investment is required and what is the return rate? or what should be minimum amount to start investing in PSA for a reasonable return? 

 

Link to comment
Share on other sites

WS,

There are different ways you can invest in PSX. The two common ones are:

1) By buying mutual funds 

2) Open an account with a broker

For Investing in mutual funds, you can head to any bank and ask them about what mutual funds they offer. Mutual funds are investment vehicle that allows pool of investors to buy group of stocks bundled in a single fund. Investment in mutual funds suits people who don't want to invest a large amount and would prefer  a small percentage of their monthly income go towards investment (5-10% of Salary, You can even go higher or  lower). Mutual funds usually have a fees 1-3% that is deducted from any profits. You can read more about investing in mutual funds here: https://www.dawn.com/news/1109126 . Meezan Bank has some very good index tracking mutual funds. You can check them out on their website if they would suit your needs. 

The second option of opening an account with a broker, requires you to do the trades. This is easy as well but remember to pick a top of the link broker as there is some history of broker fraud. Good brokers are Topline Securities, AKD Securities and any reputable bank that would offer these services. My broker is AKD. Every broker has a minimum capital investment requirement and charges they would deduct per stock trade. I think AKD requires a minimum investment of RS 100,000 (http://www.akdtrade.com). Once you open an account with a broker, you should also sign up for CDC. CDC is a  body that protects investors incase of broker fraud. If you are signed up with CDC, your broker is required to copy CDC on each transaction. That means that CDC has a record of your investments and all investments in shares are safe. Anyway, when you invest by opening an account with a broker, you directly buy shares or sell them through your broker. They will provide you with a software which allows you to do that. It is very simple. In order to know which shares to buy, you will need to spend time to know the business in which you are investing. I can elaborate on that later after you have opened an account. Here are a few rules that I have invented that can help you with stock investment:

Rule number 1 is that stock are only profitable if you invest your savings that you would not need to at least 3-5 years. If you have money set aside and you think that you will need that money in an year, don't invest in stocks. The reason being that stocks are very volatile and risky. It takes time for an investment to grow and produce returns. If your time frame is small, you are speculating the market not investing.

Rule number 2 is that you can only make money in stocks if you buy them at a reasonable price. In order to know what a reasonable price is, you will need to look up company's financial statement and go through the numbers. It is very hard to make money in stocks if you don't buy them at a decent price. 

Rule number 3 is that never give your money to someone else to invest in stocks. If someone tells you that they would provide you with a guaranteed return of X thousands Rupees per month, that is a ponzi scheme. Stay away or you will lose your hard earned money. This rule is very important and applies to everyone esp people you have known for a long time.

Rule number 4 is that never borrow money to invest in stocks. This is very dangerous. Borrowing to invest in stocks is pure speculation. 

Rule number 5 is read the  book called The Intelligent Investor by Benjamin Graham. 

So if you follow the rules you will get a good return. I have even got 100%+ returns on some investments. The key is to keep reading stuff and do it yourself.

Let me know should you have additional questions.

Thanks.

Link to comment
Share on other sites

I had a wonderful experience doing forex which I later quit. I am not into stocks but I think the same rules will apply here;

1. The most important thing is to 'be patient'. And by this I mean really be patient. Its a game of nerves. 95% people in forex lose because they are impatient.

2. Always be up to date with latest trends and news, i mean on daily basis. Don't just buy and then sleep. Get familiar with different types of predictors, study the mathematics behind different charts such as Fibonacci retracement.

3. Mix the risk levels. Don't just play only on high risk deals.

Now coming back to your question. The minimum investment depends on your goals. Short term or long-term? Risk level: low-risk or high-risk? You wanna make quick profits on the go or really want to be a sustained player?

I dont think there is leverage system in stocks as in forex. So i guess anything less than 200k pkr wouldnt yield much. Again it depends on your budget and the strategy.

But one caution: Think big, start small.

I remember in forex there were virtual accounts to practice for atleast 6 months before investing a considerable amount. See if this is the case in stocks too? Depends on the broker. Even if not, study the market daily thinking like you are actually investing. The thing with forex and stock trading is: if you cannot manage 1$, you cannot manage 1million$.

So practice lets say by assuming you have invested 10,000 pkr and then stick to the strategy and see where the market swings. Once you have tested your strategy which ofcourse you have altered time to time based on your learning, start doing investment with real money.

One thing good is you are thinking at this stage to make some passive income. Thats brilliant idea. May be you should read "Rich dad, poor dad" book, it will help. Another book i'd recommend is "4 hours work week". They wont teach you about stocks, but will definitely teach you about the ideas of passive income and work-life culture.

And lastly, you should constantly input more money every month or year, just compare in excel the compound interest (or profit) graphs. Don't just assume you will put some money and will gain on profits and re-investment. Good but also explore the power if you constantly flowing more money into your investments.

Good luck!

Link to comment
Share on other sites

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Our picks

    • Hi there,
      I am interested in performing "Performance Based Design" for a 20 story building. 
      I'll be performing "Non-Linear Static Pushover Analysis" for my model. Until now, I have decided to go with "Displacement Co-efficient method". I will be using ETABS 2017 for performing Pushover Analysis. While assigning plastic hinges, I have an option of using ASCE 41-17 (Seismic Evaluation and Retrofit of Existing buildings". I would like to know what would be a better estimate for relative distances for plastic hinges in case of beams, columns. Any input concerning assignment of hinges to beams, columns and shear walls is highly appreciated. Normally it's taken 0.05 and 0.95 or 0.1 and 0.9. What's your opinion on this?
      Secondly, it would be great if someone can recommend me a book or some good source to understand how to characterize building using performance levels. Any sort of help is appreciated.
      I have recently graduated and joined a structural design firm, so kindly guide me, considering me a beginner.

       
      • 2 replies
    • *SEFP Consistent Design*<br style="background-color:#ffffff; color:#272a34; font-size:14px; text-align:start">*Pile Design*<br style="background-color:#ffffff; color:#272a34; font-size:14px; text-align:start">*Doc No: 10-00-CD-0007*<br style="background-color:#ffffff; color:#272a34; font-size:14px; text-align:start">*Date: April 16, 2018*

      1.1. FUNCTION OF JOINT

      Beam-column joint must transfer the forces, such as moment, shear and torsion, transferred by the beam to the column so that the structure can maintain its integrity to carry loads for which it is designed.

      Another function of the beam-column joint is to help the structure to dissipate seismic forces so that it can behave in a ductile manner.

      1.2.WHY DO WE CARE

      During an extreme seismic event, the code-based structure is expected to maintain its load-carrying capacity for gravity loads even after the structure deforms into inelastic range so that it does not pose any life safety hazard. Hence, the joint can go through significant degradation of strength and stiffness, and if it fails in shear, or anchorage, the life-safety objective of code cannot be achieved.

      1.3.CONSEQUENCES OF FAILURE


      1.4.THINGS TO CONSIDER FOR BEAM COLUMN JOINT

      Longitudinal bars of beams, or slab, must be able to develop their yield stress, so that the beam/slab can transfer moment to joint. It means that longitudinal bars must have adequate development length for hooked bars. This implies that the size of the column must be such that bars can develop their tensile forces. If bars can transfer moment, they can also transfer shear as far as monolithic construction is concerned.


      The shear strength of the joint must enable the transfer of moment and shear through it.



      The joint should be Constructible: Congestion of reinforcement is the main concern.

      1.5.DESIGN SHEAR FOR BEAM COLUMN JOINT

      The design shear for beam-column joint depends upon the relative strength of beam and column at the joint.

       
      • 4 replies
    • *Comments/Observations regarding modelling in ETABS*

      *Doc No: 10-00-CD-0006*

      *Date: May 06, 2017*

      Some of the observations made during extraction of results from ETABS (v 9.7.4), for design of reinforced concrete members, are being share in this article.,

      1) Minimum Eccentricity

      ETABS always considers the minimum eccentricity for selecting the design moment of columns irrespective of the probable behavior of the column, whether short or long column. See section 10.10.6.5 and its commentary of ACI 318-08 which deals with minimum eccentricity of long columns. You should always check the design moments that ETABS uses for columns if you want to bring down the cost of construction.

      2) Unbraced/ Braced Preference

      ETABS always performs analysis of frame as if it is un-braced. You should investigate if the storey under consideration is braced, or un-braced (10.10.5.2), and decide appropriate design moments of columns.

      3) Time Period

      ETABS has a tendency to select a time period of the building that is considerably less than the value obtained by the approximate method, Method A, of the section 1630.2.2  of UBC 97. To quote the FEMA 451 document: ''Because this formula is based on lower bound regression analysis of measured building response in California, it will generally result in periods that are lower (hence, more conservative for use in predicting base shear) than those computed from a more rigorous mathematical model". So, there is no need to use the value of time period that is lot less than Ta. One should always check the time period used by the software; ETABS can overestimate the seismic force by more than 2 times.

      Visit the forum link to read the complete article.
      Link: http://www.sepakistan.com/topic/2300-commentsobservations-regarding-modelling-in-etabs/
      • 0 replies
    • The minimum amount and spacing of reinforcement to be used in structural floors, roof slabs, and walls for control of temperature and shrinkage cracking is given in ACI 318 or in ACI 350R. The minimum-reinforcement percentage, which is between 0.18 and 0.20%, does not normally control cracks to within generally acceptable design limits. To control cracks to a more acceptable level, the percentage requirement needs to exceed about 0.60% (REFRENCE ACI COMMITE REPORT 224R-01)



       

       



       

       

      So according to above statement , should we follow 0.60%, to be on more safe side??



       
      • 12 replies
    • Dear Sir/Madam,

      This email is an invitation for the participation in the First South Asia Conference on Earthquake Engineering (SACEE-2019) which will be held on 21-22 February 2019 in Karachi, Pakistan. This conference is the inaugural event in this series of conferences which has been constituted under the auspices of South Asia Earthquake Network (SHAKE). The organisers of the conference include NED University, University of Porto, University of Fuzhou, University Roma Tre and Institution of Engineers Pakistan. The conference website can be visited at http://sacee.neduet.edu.pk/.

      Please note that world leading earthquake engineering experts have confirmed their participation in the conference. These include Prof Abdelkrim Aoudia (Italy), Prof Alper Ilki (Turkey), Dr Amod Mani Dixit (Nepal), Prof Bruno Briseghella (Italy), Prof George Mylonakis (UK), Prof Khalid Mosalam (USA), Prof Humberto Varum (Portugal) and many others. The presence of these distinguished experts allows you to exchange your work/issues with them and discuss possibility of any future collaboration. Please note that participation in the conference is strictly based on registration. Early registration in different categories at reduced rates are available till 10 December 2018. Please visit the conference website to see the details and the link for registration.

      If there are any queries, please do not hesitate to contact the Conference Secretary at the following address

      Prof. Muhammad Masood Rafi
      Conference Secretary- SACEE-2019
      Chairman
      Department of Earthquake Engineering
      NED University of Engineering & Technology Karachi, Pakistan.
      Phone: 0092-21-992-261261 Ext:2605
      Email: rafi-m@neduet.edu.pk
      • 1 reply
    • What is the Minimum reinforcement For Precast Pile  according to different codes (ACI,BS)??  Pile length is 40 times of pile least dimension . 
      • 1 reply
    • Dear members, I am working on a 10 storied rcc factory building with one basement,  where floor loads are in general 125 psf(Live) . but there are 2 warehouse in the building at ground floor & 10th floor where the Live load of stacked materials are 450psf. I have modeled it and analysed in ETABS. After analysis, seeing the floor displacement for seismic load,  i am in big shock to see the pattern. the displacement pattern suddenly increased hugely & then got normal . if the warehouse load created problem, then why it effected only Ground floor level, not the 10th floor! Please tell me how can i solve it. 
      • 1 reply
    • Asalamualaikum all,

      I have columns which are conflicting with the underground water tank as shown in figure.
       

      So I have decided to make underground water tank base slab as a footing for column. So I import etabs model to safe and just take uniform water load on base slab and point load from columns.

      This is the residential house. The BC is 2tsf. But SAFE is showing tension on the base slab and the thickness from punching is 30''. I believe that thickness is too high. What can be the error? Is this approach is correct for design base slab of ugwt to carry load of two edge columns?
      • 11 replies
    • SAFE perform iterative uplift analysis,any one having experience how to check the results of this analysis???what is the purpose and scope of this analysis???
      • 15 replies
    • Shear wall design
      AOA 

      i am facing problems in shear wall design .what are the pier and spandral ?what will be the difference when we assign pier or spandral? without assigning these the shear wall design is incomplete .

      i am taking about etabsv16

      someone have document about shear wall design plz provide it 

      thank you

       
      • 13 replies
  • Tell a friend

    Love Structural Engineering Forum Of Pakistan? Tell a friend!
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.