Assalam o alaikum.
According to ACI 12.5.2,
development length for fc' = 3000, fy=60000, for normal weight concrete and epoxy less reinforcement, The required development length comes out to be
for #3 = 8.2 inch
for #4 = 10.95 inch
for #6 = 16.42 inch
for #8 = 21.9 inch
And if in my case,...