SALAM
A back-fill material has been proposed around the basement of a building. Depth of fill is about 30'-40'. On this fill a vehicle ramp will approach the building from the road. Ramp is 36'x36'x12" designed as rigid pavement. Under the ramp, Geo-tech engineer devised CBR test and FDT for...