Jump to content
  • Welcome to SEFP!

    Welcome!

    Welcome to our community forums, full of great discussions about Structural Engineering. Please register to become a part of our thriving group or login if you are already registered.

Recommended Posts

Dear Friends

i would like to suggest that if we make city based SEFP chapters for more frequent interactive meetings. What are your suggestions? @admin. subject to admin approval.

 

Regards

 

Edited by UmarMakhzumi

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Our picks

    • AOA 

      i am facing problems in shear wall design .what are the pier and spandral ?what will be the difference when we assign pier or spandral? without assigning these the shear wall design is incomplete .

      i am taking about etabsv16

      someone have document about shear wall design plz provide it 

      thank you

       
      • 9 replies
    • Salam Members,

      Congratulations to Engineers, PEC has become full signatory of Washington Accord, what are the benefits to Pakistani engineers for this agreement. 

       

      Regards   

       

       
      • 3 replies
    • Please clarify the following confusions one by one:-

       

      1. If we run P-delta analysis in ETABS, then should we ignore stiffness property modifiers for beams and columns? I have heard that if we perform P-delta analysis and apply stiffness modifiers at the same time then the moment magnification process is doubled...?

       

      2. ETABS considers selenderness of a column by applying moment magnification factors. If we run P-delta analysis also, does it mean that the selenderness of column is being over-estimated? I mean once the moments are magnified in P-delta analysis process and again through moment magnification process?

       

      Please help me understand the software myth and clarify above confusions.
      • 1 reply
    • Assalam o alaikum.
      According to ACI 12.5.2,
      development length for fc' = 3000, fy=60000, for normal weight concrete and epoxy less reinforcement, The required development length comes out to be
      for #3 = 8.2 inch
      for #4 = 10.95 inch
      for #6 = 16.42 inch
      for #8 = 21.9 inch
       
      And if in my case, ACI 12.5.3 is not fulfilled, it means now i have to provide ldh as mentioned above. ldh is STRAIGHT EMBEDMENT LENGTH + RADIUS OF BEND + ONE BAR DIAMETER as shown in figure attached. Now my question is, if in my case, main reinforcement of beam is of #6 and #4, minimum column size required will be 18 inch and 12 inch respectively. Lets say by any means, i can not select #4, #3 bars and size of column where bars are to be terminated is 12 inch, how to fullfil this development length???
      • 11 replies
    • Dear all,

      I am trying to design shearwalls through ETABS with temperature load applied over shell. At various location, spandral section fails in Shear due to temperature and piers (sometime in shear, mostly in flexure).  (See Attached Image)

      Certainly all the problem in Shearwalls are due to temperature. I don't want to increase cross section of spandral or pier at some location just due to temperature load case as it will appears non-uniform with rest of the wall. 

      I have seen stiffness modifier affect distribution of forces and also rigid/semi rigid daiphragm assumption. 

       

      Can anybody guide how to properly design the shear wall with temperature load applied in ETABS or share any similar experience. Thanks in Advance.    
      • 15 replies
    • ENGINEERS;
      I WILL LOOSE MY BRAIN FROM ETABS. 
      I DECIDED TO MAKE MANUAL MESHING FROM AREA ELEMENTS BESIDE EACH OTHER AND EVERY HING WAS FINE .
      BUT AFTER DEVISION SAY 7*7 ELEMNTS FOR EVERY BIG ELEMENT AND MAKING ETABS CHECH..................THEN 500 ERROR MESSAGE THAT ALL ELEMNTS ARE CLOSE TO EACH OTHER.  WHAT ARE GOING...... SOMEONE TELL ME PLEASE...... I WILL LOST MY WORK
      • 6 replies
    • Assalam o alaikum.
      I have just designed a frame structure with SMRF. The out put of shear seams weird to me. Column reports design shear Av/s as 0.045. (Images are attached). but when i right click the member, it must show me the most critical case HIGHLIGHTED AUTOMATICALLY. But it highlights load combo 38 (auto-generated combos have been used) which reports Av/s as 0.038. And 0.045 value is at combo 32. Is their any logic behind it?? More over how to interpret this Av/s?? means 0.045 in kip-in units means what? How can i convert this into spacing?? 
      • 9 replies
    • Hello everyone, I hope all of you will be fine. In etabs when we apply Response Spectrum loading on a multistoried building with 2 basement floors. At what floor level this loading will be applied as in equivalent static seismic analysis, we can apply EQX & EQY on any floor we like as this option is available in etabs but the problem is with response spectrum and time history analysis. please if someone knows and have the experince, share it i shall be very thankful.  
      • 5 replies
    • Salaikom dear professionals,
      First of all I would like to express my sincere thanks to the initiators of this forum for establishing such an exceptional atmosphere for knowledge/experience sharing, I it is really useful, In fact since I have found the forum I am mostly online and busy reading the posts. I would also like to thank the members for their professional comments and advice.
      As my first post in this forum I would like to ask the following queries:
      1-After running the analysis and design when I check the DESIGN DATA through Display >> Show Tables >> DESIGN DATA >> Concrete Frame Output, there is no specific message in Column Summary Data and Beam Summary Data, but in Joint summary data it is showing that “Joint B/C check not done”. Does anyone has any idea? I am sharing the ETABS model for your information and easy reference.
      ETABS MODEL.zip
      2- ETABS provides greater area of steel in the upper column than the column at BASE, perhaps due to higher moment. Could someone explain why this is so? In practice should we maintain maximum steel in both stories? Or we shall follow what the software suggests?
      3- Beside considering the minimum thickness required for deflection control of Beam as per Table 9.a Chapter 9 ACI-318 , using concrete crack behavior in ETABS and checking story drift, Do we have to check the deflection of beams for the serviceability propose elsewhere in ETBAS? If yes, Could anyone explain it?
      Regards, and look forward to any explanation
      • 13 replies
    • Posting this thread to break the ice. Modelling domes is very easy in Etabs/SAP. All you need to do is to draw the curvature of the dome in elevation by a series of straight lines, but draw only the one half. Then using the apex at centre point, radially extrude the line say 24 times at 15 degree intervals (or 48 times at 7.5 deg intervals. This feature is under Edit> Extrude Lines to areas. You can further use this geometry for Finite Element Analaysis.
      • 22 replies
  • Recently Browsing   0 members

    No registered users viewing this page.

  • Similar Content

    • By UmarMakhzumi
      Dear All,
      The forum has been recently upgraded with tons of new features. Please take a minute and explore the new items. Your feedback is much appreciated. You can check out the following thread that summarizes biggest changes to forum. 
      Thanks.
       
       
    • By UmarMakhzumi
      Dear All,
      I have just finished modifying a bunch of stuff related to member roles and I am very excited to announce it.
      There are some new member roles that have been created:
      1) SEFP Associate
      As you know that I have been requesting help with a number of stuff on SEFP and there are very generous people who have volunteered. To recognize their effort, I have created this role. An example is @Saad Pervez, who is doing an excellent job running our Social Media pages. From now onwards, you will find him assigned to SEFP Associates. Thanks Saad for your help.
      2) SEFP Contributor
      There are a few members who have been with us through thick and thin. Because, they have regularly answered questions and contributed to forum by not only providing information but their engineering judgement, this role has been created in recognition of their efforts.  @Ayesha has been assigned to this and we look forward to add more members to their club.
      3) SEFP VIP
      @EngrUzair deserves this without any question. He is the most senior member of the forum providing invaluable support. Not only this but he has also been a teacher at our beloved Alma Mater. I have created this category in recognition to his efforts.  We "might" be adding very few people to this role in upcoming years.
      4) Moderators and Super Moderators
      Our current staff consists of @waqar saleem, @Rana and @BAZ. @Rana and @BAZ have global moderation over the forum and @waqar saleem is currently moderating all the technical sections. They all are doing a great job and I am very thankful them. Because of overall moderation assignment, I have split moderators in Super Moderator and Moderators. Supermods might also get portion of Admin rights over coming years. I have a plan for that but nothing set in stone.
      Like always, please provide your feedback and let me know what else should be done/ undone.
      Thanks.
    • By UmarMakhzumi
      All,
      Starting today, I would be experimenting with some advertisement options on the forum. That would include making ads visible to guests (non-registered members) only. It would also help me estimate the amount this site can pay for itself. Right now, the estimated projections are very low in-terms of revenue (5-10% max of yearly budget). Members would always see a clean forum (no ads).  Guests, however would be subjected to Ads.
      Any suggestions or ideas are welcome.
      Thanks.
       
    • By UmarMakhzumi
      Hello Everyone,
      Here is a list of new features in the upcoming update:
      Updates to Editor ( @EngrUzair might like this one )
      Fluid Forum View ( @Rana check this out)
      Reactions
      Recommended Replies (Moderator Related Stuff)
      Content Messages (Moderator Related Stuff)
      Leaderboard Enhancement
      Richer Embeds
      Forcing Members to Complete Profile
      Improvements to Social Sign In
      Clubs  (Clubs will allow forum members to create their own groups in the forum and discuss things other than structural engineering)
      I am very excited about all these improvements. Stay tuned for more. This update is expected to roll out in summer.
      Thanks.
    • By UmarMakhzumi
      All,
      You can now get a free email @sepakistan.com. All you need to have is more than 25 posts (Title of Lieutenant).
      The email is a forwarding email, meaning that you get to keep your original email and all emails sent at your email@sepakistan.com will show up in your original email inbox. 
      Let me know if anyone is interested.
      Thanks.
    • By UmarMakhzumi
      Hello Everyone,
      If you ever wanted to contribute towards SEFP, here is your chance. We at SEFP need help with the following:
      1) 2 volunteers to help us run our Facebook page. If you don't mind taking 10 minutes out each day to share a few articles from this website to the Facebook page, then this position is for you.
      2) SEFP Mentoring Circle Coordinator is required. We are planning to start Mentoring Circle and would need someone to be the co-ordinator of the program. 
      If you are interested, please let me or any other moderators know.
      Thanks.
    • By Rana
      I think its time now to categorize questions based on the difficulty level.
      For example;
      A toddler asking very basic question like what is mass source or time period, should be classified under lets say Easy or 0 or Beginner or Simple etc category. And as such specific moderators should be assigned to take care of that forum.
      Then we can make other sections like moderate or difficult. Where one really need to relearn/review the question and think about the answer carefully.
      I think all the internet is full of the same basic questions like time period, base shear etc. Isnt it the time to take SEFP a step ahead and not just another forum full of the same basic questions? How can we re-categorize the SEFP sections to give it a new feel, not just like concrete, steel, software issues etc. What do you think?
    • By UmarMakhzumi
      Dear All,
      Please see the latest member rank hierarchy that has been implemented. Your feedback is more than welcome.
      Thanks.

    • By UmarMakhzumi
      Hello Everyone,
      I would like to draw your attention to questions being asked in message boxes instead of being posted on forum. The reason I am raising this is that recently I have seen a spike of inbox messages addressed to me asking for solutions rather than the question being posted on the forum. I assume others are getting similar messages. FYI, I don't have access to inboxes and all your conversations are 100% private. I would like to request everyone to please ask questions on the forum and discuss it on the forum instead of inboxes. The reason being that the discussion can be beneficial for the rest of the community and also other members can then critique or appreciate an opinion.
      Let me know should you have any questions.
      Thanks.
    • By UmarMakhzumi
      Hello all,
      I had to take the website down for some regular maintenance but I am glad that we are back up in due time. Sorry for any inconvenience. I have also upgraded the forum to the latest version. 
      Thanks.
  • Recent Discussions

  • Latest Forum and Club Posts

    • Dear Shafqat, AA. Field work of a civil engineer generally consists of following activities: a. Surveying / levelling of the project area b. Supervision of construction work for buildings, roads, culverts, bridges etc., in accordance with detailed working drawings, applicable material specifications and quality standards. c. Preparation of material estimates, by calculating quantities of different items of work (e.g., excavation, concrete, brickwork, plaster, reinforcing steel etc-in case of buildings, and subbase, base, wearing course etc, in case of roadwork) included in working drawings of the project. 2. To perform all these tasks in better & efficient way, you will need to review your class notes & text books of relevant subjects (Surveying, Civil Engineering Practice, Estimating & Costing, Highways & Roads, Engineering Materials) taught during your civil engineering studies, in order to understand theoretical & practical aspects of these subjects. 3. As regards, which subject you should review first, would depend upon the work you are asked /assigned to do by your senior engineer. As a Trainee Engineer, you will certainly be attached with a senior engineer, who will assign you different engineering tasks & check your work. You may & must obtain his advice in all the work matters, where you are in doubt, or unclear about how to perform a given task. 4. In case you have futher querries, please do ask, by narrating your problem in detail. I will be happy to help you, as far as I can. By the way, what kind of civil works are carried out by your company mostly? Building work, roadwork or both? Regards.
    • Dear Shafqat Hussain Welcome to the forum. Check what you require at the job and discuss with your seniors, ask them for help if you do not understand something. At first job mostly you don not know exactly what to do but the main engineering profession skill is lifelong learning which comes forward and you learn new things. Contact some senior surveyor for the level and theodolite guidance.   Regards
    • , i just graduated as bachelor   in civil engineering i got the job in chinese company due to my chinese language skill but i don"t know knowledge about civil engineering so i need some information to continue this job because i can speak chinese and don't know about my major , my duty is as trainee engineer mean and i want  to get more  knowledge about level ,instrument measure  and theodolite    it will really great help that what kind of knowledge i should learn mean while  i will be waiting for reply 
    • Following are a few disadvantages of using higher strength rebars with a lower strength concrete: 1. Larger tension (as well as compression) development & lap-splice lengths will be required. 2. Overall load carrying capacity of a compression member will be lesser, compared with when higher strength concrete is used. 3. Maximum amount of steel reinforcement, that can be used in a flexural member, will also be lesser, thereby reducing its overall load carrying capacity. 4. Member size & self-weight will be somewhat larger, when steel yield strength is more than 60,000 psi. Regards.    
    • What kind of Problem may arise if High Strength Rebar is used with Low Strength Concrete. Say 3000 psi concrete with 72.5 grade rebar?
    • I agree with waqar. IMO, childern must be motivated towards & provided opportunities to play different health improving outdoor games (football, cricket, badminton, etc) , instead of watching TV or playing games on computer. My chidren are school going, and whenever they have done their homework, and it is pleasant outside (especially after Asr prayer), I send them out in a nearby park area. There they can play football or cricket, and can do exercise as well. On weekends, during vacations and on other days when they are unable to go outside, they generally watch tv for 1-2 hours.
    • Greetings All,   Technopole industries is a UAE based pole manufacturing factory which is currently in a requirement for a hard working, let me repeat that again an extremely hard working structural engineering to be part of our team. The Factory manufactures Steel poles & Mast more information can be found on Technopole Industries website. interested candidates can inbox me or drop their CV at fawad@technopoleindustries.com. Best Of Luck Guys
    • My kid is 2 nd 3 months old, we normally try to keep screen time as low as 1 hour/ 2 hour, when he watches cartoon or use mobile for game more than 2 hours, he becomes too difficult to handle. So we bought books that we read with him like picture stories and take him outside where he can play, run and climb monkey bar etc, after playing  he becomes satisfied and easy to handle. that's my personal experience :-). Regards
    • hi umar, thanks a lot for your valuable links. Best Regards   
    • Wsalaam... That is the general principle, however I was wondering if people could share their personal experiences.  Here is an article about it as well: http://www.cbc.ca/news/health/screen-time-preschool-1.4140491 Thanks.
×

Important Information

By using this site, you agree to our Terms of Use and Guidelines.