Jump to content

Muhammad Hashmi

Member
  • Posts

    122
  • Joined

  • Last visited

  • Days Won

    8

Muhammad Hashmi last won the day on October 22 2022

Muhammad Hashmi had the most liked content!

2 Followers

Profile Information

  • Gender
    Male
  • Location
    Saudi Arabia
  • University
    Sir Syed University of engineering & tech Karachi
  • Employer
    Arcadis
  • Interests
    Reading Engineering Articles , Walking

Recent Profile Visitors

1555 profile views

Muhammad Hashmi's Achievements

  1. Dear Members Struggling with a very hard time these days. Anybody have relations in good reputable engineering consultancy for the job of senior structural engineer in Saudi Arabia or any part of gulf region please post. I will share my resume. My resident permit ( IQAMA) is transferable and notice period is 2 months , in case vacancy in Saudi Arabia. Currently located in Jeddah, but happy to relocate.
  2. Yes. We can 10.3.1.2 For columns with cross sections larger than required by considerations of loading, it shall be permitted to base gross area considered, required reinforcement, and design strength on a reduced effective area, not less than one-half the total area. but need to be considered the following as well This provision shall not apply to columns in special moment frames or columns not part of the seismic-force-resisting system required to be designed in accordance with Chapter 18.
  3. Assalam O Alykum In the same project / same consultant engineer 1. For G+1 story building having length 45m and width of 16m emphasizing to use the structural lean / blinding concrete ( non reinforced with fiber or mesh) having thickness 200mm and 200mm offsets minimum from all sides from the footing with compressive strength 30MPA. 2. Provide the size of footing by considering the bearing capacity of blinding / lean concrete 300 Kn per meter square or 30 MPA. In other words, footings will be designed based on the compressive strength of concrete. 3 Provide the size of blinding offsets from the face of footing by considering the bearing capacity of soil that is 200 Kn per meter square. Does any code allow us to use such type of practice to get economical result. My practice is to provide blinding just to have plain surface /level or safe from mud at the time of raining. If seniors can help particularly in this regard
  4. Assalam O Alykum What he is saying is "Concrete is stronger in compression then in tension" In case found any tension on the walls of the tank while analysis put the full minimum horizontal reinforcement on the tank walls where tension develops 0.002bxh. May be I am not explaining well?
  5. Assalam O Alykum In one of our under construction project. We have one Under ground water tank subjected to truck loading AASHTO HS20. Water tank size is 45x11mx3.0m clear height. 1. The tank walls are probed from the slab at the top & fixed at the bottom. 2. The tank walls are also checked based on water pressure and no backfilling around at the time of leak test. 3. Consultant engineer made some comments and on of his comments is show below " The code requires to put the full minimum horizontal reinforcement on the sides where tension develops so if the tension develops on both sides considering all loading case , then both sides must receive full minimum reinforcement each side" My question is that when the retaining wall is braced by means of slab on the top, How the tension force will develop. second in case at the time of leak test. How do we calculate the tension force at the top of wall. If anybody can help in this regard?
  6. Assalam O Alykum In one of our project ( Hospital building) we have Rcc walls are proposing instead of lead shield ( Radiation area for cancer patients). Rcc walls proposed thickness by the radiation consultant varies from 160mm to 240mm. Rcc walls are none load bearing, floor to floor height is 4.2m. However, Non-load bearing Rcc walls height is 3.1m I want to know is there any code criteria that for such thickness we must have 2 layers of vertical reinforcement and up to that thickness yes we can put 1 layer. Can you please help in this regard.
  7. Assalam O Alykum Can any one please advise about the below warning message given failure for the vertical members only columns? Warning #52 Deltans exceeds 1.4 (ACI 318-14 6.2.6, 6.6.4.5.1). Thank you M.Omair Hashmi
  8. Assalam O Alykum Dear Badar Do you have any authentic ledge design spread sheet for the cast in place ledge for L and T ledges both. Small confusion regarding the torsion on cast in place T Beams. If we are talking about torsion on the T-beam or the middle beams where the Hollow core slab is resting on both sides. We are saying that torsion occurs during construction right?
  9. Hi Abbas The special GPR (Ground penetration Radar test) looks suitable for your case that is generally applied to check the workability of concrete joint , honey comb , cold joint or weak concrete , change in properties of material. Voids and cracks by using electromagnetic radiation for that type of structure.
  10. Assalam O Alykum You are right we can go with the carbon fiber for slab strengthening. But due to management issue and working in a contracting company cannot go for that.
  11. Assalam O Alykum In one of our constructed project, the architect proposed hydrotherapy water pool on one area of existing flat slab of thickness 350mm. ( Hospital building) After analysis it is observed that the area with in the proposed location of pool required slab strengthening. There is absolutely no chance to add steel columns or concrete columns underneath. The steel beams can be proposed underneath, but I am trying to avoid due to rusting and corrosion due to any leakage of water at later stage. My questions are ; 1. How to calculate number of shear connectors , diameter of shear connectors and spacing between the shear connectors to work both existing flat slab thickness 350mm and proposed flat slab thickness varies between 75mm to 100mm monolithically and to avoid any chances of horizontal shear. 2. The requirement of reinforcement is coming at the bottom, where do I put these bars at the middle ? or above the concrete cover. I am also attaching the sketch for better understanding. If anybody can help in this regard. Shear connectors Flat slab.pdf
  12. Assalam O Alykum Do you understand that the supporting beam is subjected to torsion, in addition to shear and bending moment, due to connection detail chosen for transferring forces from the precast hollow-core slab to RC beam? yes i understand. Final connection detail is not yet received from the designer of HCS. The detail which I shared is preliminary. Can you imagine what will happen if beam has not been designed for the interaction of torsion and shear? Can you imagine that the beam will tend to twist or rotate about its longitudinal axis if the adequate amount of torsional reinforcement is not present? What will be the result of that rotation? Yes I can understand. In this case, can it lead to an increase in connection forces that may not have been accounted for? Any possibility of sending any recommended connection details to avoid any torsion or reduced the torsion on the cast insitu beams.
  13. Assalam O Alykum Can anybody help in giving reference for the allowable settlement values of piles itself? I am unable to find it out but have something like a thumb rule that it is 2% of dia of pile.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.